EPC 2030 in Flanders: Renovation Timeline
Flanders requires buyers of EPC E or F properties to achieve label D within 5 years, targeting label C for all homes by 2030.
The information presented is for informational purposes only and does not constitute legal advice. Consult a professional for personalized advice.
The renovation obligation in Flanders
Since January 1, 2023, Flanders has introduced an energy renovation obligation for buyers of residential property. It is the most ambitious measure in Belgium regarding the energy transition of the housing stock.
The timeline
- 2023: Every buyer of an EPC E or F property must achieve at least label D within 5 years
- 2028: Expected extension to EPC D properties (target label C)
- 2030: Target label C minimum for the entire Flemish residential stock
- 2050: Target label A for all dwellings
What works to achieve label D?
For a property rated E or F, typical works include:
- Roof insulation (if not insulated): gain of 1 to 2 labels
- Replacing single with double glazing: gain of 0.5 to 1 label
- Replacing the boiler with a condensing model
- Partial wall insulation
Average budget: between 15,000 and 40,000 EUR to go from E/F to D.
Penalties
Penalties for non-compliance are not yet definitively set, but the Flemish government plans administrative fines and loss of certain tax advantages (such as the reduced 3% registration duty rate).
Financial support
To support this obligation, Flanders offers the Mijn VerbouwPremie program with substantial subsidies for each type of work. The EPC Label Premium offers an additional bonus of 2,500 to 5,000 EUR for households achieving label A or B.
Explore available subsidies via our Eco-Score page and check the average EPC of your municipality on our EPC tool.
Related articles
EPC Obligations by Region
The EPC certificate is mandatory for every sale or rental in Belgium. Each region imposes its own rules and renovation timelines.
BrusselsRenovation Obligations in Brussels (Renolution)
Brussels' Renolution plan combines generous subsidies with progressive renovation obligations for the most energy-intensive buildings.