Heated floor area, terraced or semi-detached house
- Licence
- CC BY 4.0
- Period
- 2023 to 2025
Method: Median heated floor area of the energy performance certificates issued for terraced and semi-detached houses in the municipality over the last three years (SPW Énergie, ODWB data). The area is measured from the outside, walls included.
Limits: Only counts homes that received a certificate, mostly on sale or letting. Wallonia only, with at least 30 certificates. No figure is shown below 30 observations.
Heated floor area, detached house
- Licence
- CC BY 4.0
- Period
- 2023 to 2025
Method: Median heated floor area of the energy performance certificates issued for detached houses in the municipality over the last three years (SPW Énergie, ODWB data). The area is measured from the outside, walls included.
Limits: Only counts homes that received a certificate, mostly on sale or letting. Wallonia only, with at least 30 certificates. No figure is shown below 30 observations.
Heated floor area, flat
- Licence
- CC BY 4.0
- Period
- 2023 to 2025
Method: Median heated floor area of the energy performance certificates issued for flats in the municipality over the last three years (SPW Énergie, ODWB data). The area is measured from the outside, walls included.
Limits: Only counts homes that received a certificate, mostly on sale or letting. Wallonia only, with at least 30 certificates. No figure is shown below 30 observations.
Homes rated A or B
- Licence
- CC BY 4.0
- Period
- 2026
Method: Share of the municipality's energy performance certificates in class A or B, in the Walloon register published by SPW Energy on ODWB.
Limits: Only homes with a certificate count: those sold, let or renovated since 2010. Flanders does not publish this breakdown by municipality, and Brussels only a regional average.
Homes rated F or G
- Licence
- CC BY 4.0
- Period
- 2026
Method: Share of the municipality's energy performance certificates in class F or G, in the Walloon register published by SPW Energy on ODWB.
Limits: Only homes with a certificate count. Homes not sold or let since 2010, often older ones, are missing.
Homes built before 1945
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed before 1945, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Central heating
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings with central heating or air conditioning, according to the land registry. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The land registry is not always updated after works: a building fitted since may still appear without central heating. No figure below 100 buildings. No figure is shown below 100 observations.
Number of homes
- Licence
- CC BY 4.0
- Period
- 2025
Method: Number of homes in the land registry on 1 January 2025, all building types together (Statbel, building stock).
Limits: Empty homes and second homes count too. The figure depends on the size of the municipality and is not compared with others.
Built before 1900
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed before 1900, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1900 to 1918
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1900 to 1918, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1919 to 1945
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1919 to 1945, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1946 to 1961
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1946 to 1961, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1962 to 1970
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1962 to 1970, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1971 to 1981
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1971 to 1981, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1982 to 1991
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1982 to 1991, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 1992 to 2001
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 1992 to 2001, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built from 2002 to 2011
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed from 2002 to 2011, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Built after 2011
- Licence
- CC BY 4.0
- Period
- 2025
Method: Share of houses and buildings completed after 2011, among those with a known completion year. Statbel, building stock on 1 January 2025, from the land registry. Houses and blocks of flats count as buildings, whatever the number of homes inside.
Limits: The year used is the completion year in the land registry; a major renovation does not change it. Buildings with an unknown year are left out. No figure below 100 buildings. No figure is shown below 100 observations.
Radon in homes
- Licence
- free to reuse with attribution
- Period
- 2026
Method: Share of radon measurements in the municipality's homes above 300 Bq/m³, the Belgian reference level (FANC, July 2026 map).
Limits: The homes measured are not chosen at random: measurements are more frequent where the risk is known. No figure below 20 measurements. No figure is shown below 20 observations.
Radon risk class
- Licence
- free to reuse with attribution
- Period
- 2026
Method: Risk class given by the FANC to the municipality (0, 1a, 1b, 2a or 2b, from lowest to highest), based on measurements and geology.
Limits: The class covers the whole municipality; the risk varies from street to street and only a measurement tells what happens in a given home.
Buildings in a high flood hazard zoneImmolytics estimate
- Licence
- CC BY 4.0
- Period
- 2021
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (SPW PICC), with the Walloon Public Service (SPW) flood hazard map in force since March 2021, which covers rivers overflowing and surface runoff. We count the share of buildings whose highest class touched is high hazard: each building counts once.
Limits: This map was adopted before the July 2021 floods and does not include them. A building counts as soon as the zone touches its footprint, to within one metre. Hazard describes how likely and how strong a flood is, not the possible damage. No figure is shown below 100 observations.
Buildings in a medium flood hazard zoneImmolytics estimate
- Licence
- CC BY 4.0
- Period
- 2021
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (SPW PICC), with the Walloon Public Service (SPW) flood hazard map in force since March 2021, which covers rivers overflowing and surface runoff. We count the share of buildings whose highest class touched is medium hazard: each building counts once.
Limits: This map was adopted before the July 2021 floods and does not include them. A building counts as soon as the zone touches its footprint, to within one metre. Hazard describes how likely and how strong a flood is, not the possible damage. No figure is shown below 100 observations.
Buildings in a low flood hazard zoneImmolytics estimate
- Licence
- CC BY 4.0
- Period
- 2021
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (SPW PICC), with the Walloon Public Service (SPW) flood hazard map in force since March 2021, which covers rivers overflowing and surface runoff. We count the share of buildings whose highest class touched is low hazard: each building counts once.
Limits: This map was adopted before the July 2021 floods and does not include them. A building counts as soon as the zone touches its footprint, to within one metre. Hazard describes how likely and how strong a flood is, not the possible damage. No figure is shown below 100 observations.
Buildings in a high flood hazard zoneImmolytics estimate
- Licence
- CC BY 4.0
- Period
- 2025
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (UrbIS), with Brussels Environment's 2025 flood hazard map, which combines rivers overflowing, surface runoff, sewer backflow and rising groundwater. High hazard: a flood about once every 25 years. Each building counts once, in the highest class it touches.
Limits: This map has no regulatory value. A building counts as soon as the zone touches its footprint, to within one metre. A street missing from the map can still flood, for instance when a local sewer is blocked. No figure is shown below 100 observations.
Buildings in a medium flood hazard zoneImmolytics estimate
- Licence
- CC BY 4.0
- Period
- 2025
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (UrbIS), with Brussels Environment's 2025 flood hazard map, which combines rivers overflowing, surface runoff, sewer backflow and rising groundwater. Medium hazard: a flood about once every 100 years. Each building counts once, in the highest class it touches.
Limits: This map has no regulatory value. A building counts as soon as the zone touches its footprint, to within one metre. A street missing from the map can still flood, for instance when a local sewer is blocked. No figure is shown below 100 observations.
Buildings in a low flood hazard zoneImmolytics estimate
- Licence
- CC BY 4.0
- Period
- 2025
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (UrbIS), with Brussels Environment's 2025 flood hazard map, which combines rivers overflowing, surface runoff, sewer backflow and rising groundwater. Low hazard: a flood about once every 1000 years. Each building counts once, in the highest class it touches.
Limits: This map has no regulatory value. A building counts as soon as the zone touches its footprint, to within one metre. A street missing from the map can still flood, for instance when a local sewer is blocked. No figure is shown below 100 observations.
Buildings in a medium flood probability zoneImmolytics estimate
- Licence
- Flemish free reuse model licence (Modellicentie gratis hergebruik)
- Period
- 2023
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (GRB), with the Flemish 2023 flood prone area maps (rivers, heavy rain and sea, source: VMM). We keep the highest class of the three maps, read to within 2 m. Medium probability: a flood about once every 100 years. Each building counts once, in the highest class it touches.
Limits: The low probability zone that only appears with climate change is not counted. A building counts as soon as the zone touches its footprint, to within one metre. On the coast, the sea map also covers the polders behind the dunes and dykes: a large part of a municipality such as Bredene falls within it. These are the same maps a seller must disclose when selling in Flanders. They cannot be compared with those of Wallonia or Brussels. No figure is shown below 100 observations.
Buildings in a low flood probability zoneImmolytics estimate
- Licence
- Flemish free reuse model licence (Modellicentie gratis hergebruik)
- Period
- 2023
Method: Immolytics estimate. Each building with an address (BeST address register of FPS BOSA) is matched, through its footprint (GRB), with the Flemish 2023 flood prone area maps (rivers, heavy rain and sea, source: VMM). We keep the highest class of the three maps, read to within 2 m. Low probability: a flood about once every 1000 years. Each building counts once, in the highest class it touches.
Limits: The low probability zone that only appears with climate change is not counted. A building counts as soon as the zone touches its footprint, to within one metre. On the coast, the sea map also covers the polders behind the dunes and dykes: a large part of a municipality such as Bredene falls within it. These are the same maps a seller must disclose when selling in Flanders. They cannot be compared with those of Wallonia or Brussels. No figure is shown below 100 observations.
Permits for new homes
- Licence
- CC BY 4.0
- Period
- 2024
Method: Number of building permits granted during the year for new residential buildings, according to Statbel.
Limits: A permit is not a building site: some approved projects are never built, or built later. A block of flats counts as one building.
Permits for renovations
- Licence
- CC BY 4.0
- Period
- 2024
Method: Number of building permits granted during the year to renovate residential buildings, according to Statbel.
Limits: Only renovations that need a permit are counted. Most insulation, heating or roofing work does not.